{"version":"2.0","class":"dataset","label":"Indicators on operation of subway by indicators and years","updated":"2021-07-08T04:00:00Z","role":{"metric":["ContentsCode"]},"id":["ContentsCode","indicators","years"],"size":[1,4,18],"dimension":{"ContentsCode":{"label":"EliminatedContents","category":{"index":{"EliminatedValue":0},"label":{"EliminatedValue":"Indicators on operation of subway"},"unit":{"EliminatedValue":{"base":"-","decimals":1}}},"extension":{"elimination":true}},"indicators":{"label":"indicators","category":{"index":{"0":0,"1":1,"2":2,"3":3},"label":{"0":"Subway route miles at the end of the year, km","1":"Number of subway cars, units","2":"Transported passengers, mln. passengers","3":"Passenger turnover, mln. passenger-km"}},"extension":{"elimination":false,"show":"value"}},"years":{"label":"years","category":{"index":{"0":0,"1":1,"2":2,"3":3,"4":4,"5":5,"6":6,"7":7,"8":8,"9":9,"10":10,"11":11,"12":12,"13":13,"14":14,"15":15,"16":16,"17":17},"label":{"0":"2007","1":"2008","2":"2009","3":"2010","4":"2011","5":"2012","6":"2013","7":"2014","8":"2015","9":"2016","10":"2017","11":"2018","12":"2019","13":"2020","14":"2021","15":"2022","16":"2023","17":"2024"}},"extension":{"elimination":false,"show":"value"}}},"extension":{"px":{"decimals":1,"official-statistics":false,"aggregallowed":true,"language":"en","contents":"Indicators on operation of subway","description":"Indicators on operation of subway","descriptiondefault":false,"heading":["years"],"stub":["indicators"],"matrix":"TT-tr-et3","subject-code":"TT","subject-area":"Transport and tourism"}},"value":[12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,12.1,70,70,70,70,70,45,45,45,45,45,45,45,45,45,45,45,45,45,17.3,18.9,18.9,19.9,17,14.9,15.6,15.8,15.8,15.3,16.2,18.5,20,10.8,18.5,23.3,25.6,26.3,65.6,71.9,71.7,75.5,64.6,56.7,59.2,60.1,60,58.2,61.5,70.2,75.9,40.9,70.2,88.6,97.4,100.1]}